Results for
Turkey
We processed 1000 tons of steel for our project, which will cover an area of 16.800m². We prepared the parts of our work, in which each stage was developed in detail and meticulously, for assembly, and transferred them from Turkey to Northern Iraq without any problems.
Request for a quoteTurkey
With a professional approach in the sector, we can offer innovative solutions that are at the forefront of the world in prefabricated building design, engineering prefabricated construction, customized modular buildings for permanent or temporary projects, and product quality management of prefabricated and modular buildings. strict international quality standards. Prefabricated buildings are solutions developed to perfectly meet the space needs of customers for whatever purpose. Prefab building systems provide a controlled temporary space designed to suit your specific needs. With a growing and changing business, space needs can change rapidly, and our prefabricated system allows you to meet space needs as soon as possible with minimal disruption to the facility.
Request for a quoteTurkey
We completed our project Ethiopia, which we designed and manufactured, and made the shipment. We design the most suitable structure for the companies we cooperate with and ship them all over the world.
Request for a quoteTurkey
In the Abalioglu Feed Factory project located in Burdur, we have performed warehouse steel processing. we used 78 tons of steel on an area of 2000 m2.
Request for a quoteTurkey
In the AYB Textile project, we have expanded the area of 2200 m2 to an area of 4400 m2. During the operations carried out while expanding the production area, we carried out the production without stopping and removing the machines inside. We would like to thank AYB Textile for this cooperation.
Request for a quoteDo you sell or make similar products?
Sign up to europages and have your products listed
Turkey
In our project, which we carried out with Doğrar Metal, one of the prominent names in the sector, we followed the path by prioritizing high efficiency in an area of 750m². In our study, we obtained a whole by using bolts in European Standards. Our project has become ready for use in order to expand the working and storage area of the company.
Request for a quoteTurkey
With our expert team of professionals and prefabricated and modular assembly management experience, we partner with clients, design teams and builders to deliver projects that set new standards in quality, cost savings and on time.
Request for a quoteResults for
Construction of prefabricated buildings - Import exportNumber of results
9 ProductsCountries
Company type