Results for
Switzerland
The measurement is done uninterrupted in all four quadrants and can be adapted optimally to the system to be monitored. Both the average time of the measurement and the expected maximum signal level can be configured. • System state monitoring: class 0.2 • All-purpose: V/I, P/Q/S, f, PF etc. • Remote communication via Modbus • DM5S: Energy metering: class 0.5S • DM5F: Response time 15…25ms • Assisted commissioning • Configuration with or without power supply
Request for a quoteDo you sell or make similar products?
Sign up to europages and have your products listed
Results for
Energy distribution - Import exportNumber of results
1 ProductCountries
Company type