• europages
  • >
  • COMPANIES - SUPPLIERS - SERVICE PROVIDERS
  • >
  • scaffolding

Results for

Scaffolding - Import export

Germany

Germany

The shoring frames TG 60 are made of steel tube of higher strength and are stiffened with 2 small diagonal braces. To transfer tensile forces, every frame is secured by hinged pins, locking pins or bolts to each other. In this way the towers can be assembled on the ground and placed by a crane. The shoring frames TG 60 are designed symmetrically – because of that you don’t have to care about the direction of the diagonal braces.

Request for a quote

Germany

GASS is a further development of the commercially available aluminium shoring systems. With a maximum safe working load of up to 140 kN per leg, this is the aluminium shoring system with the greatest load-carrying capacity.

Request for a quote

Germany

Folding jack „Universal“ U1500 very robust design with supporting cross tube of square tube and side welded tube socket for installation of railing posts as back guard to protect from falling or for top mounted parts.

Request for a quote

Germany

Verified by Europages

The safety ladder is the ideal solution for professionals who need a reliable and safe ladder for demanding work up to a height of 8 metres. This extendable ladder is equipped with an anchor point on the last rung, which allows the user to attach themselves to a safety line. In addition, the safety ladder has side supports with extendable legs that additionally secure the ladder against falling over sideways. The yellow, highly visible ladder is insulated up to 100 kV, anti-magnetic and resistant to moisture, acids, corrosion and UV rays.

Request for a quote

Germany

Verified by Europages

Rolltec Aluminium assembly scaffold Working height: bis 2,90 m

Request for a quote

Germany

Verified by Europages

Protec XXL Aluminium mobile scaffold broad structure - Working height: 3,30 m - 12,30 m

Request for a quote

Germany

Verified by Europages

Protec XSP Aluminium scaffold platform - Working height: 2,90 m - 3,70 m

Request for a quote

Germany

Verified by Europages

Protec XS Aluminum folding scaffold - Working height: 3,00m - 11,80 m

Request for a quote

Germany

Verified by Europages

Protec Aluminium mobile scaffold - Working height: 3,00 m - 12,30 m

Request for a quote

Germany

Verified by Europages

Climtec Aluminium working scaffold Working height: 3,00 m - 7,00 m

Request for a quote

Germany

Verified by Europages

Mobile scaffold system components

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 5500 Working height: 4,50 m - 12,50

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 5000 Working height: 4,30 m - 14,30 m

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 1000 Working height: 4,30 m - 14,30 m

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 500 Working height: 4,40 m - 14,40 m

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 50 Working height: 3,00 m - 14,40 m

Request for a quote

Germany

Verified by Europages

Mobile scaffold series 10 Working height: 3,00m - 14,40 m

Request for a quote

Do you sell or make similar products?

Sign up to europages and have your products listed

Add my business

Germany

Verified by Europages

GRP walkways and platforms can be individually adapted to your needs in terms of length, width, support distance, etc. It is also possible to absorb higher loads, which can be taken into account in the design phase. Generally speaking, all TC structures are developed in accordance with DIN EN ISO 14122. Pultruded GRP construction profiles produced by Exel Composites meet the requirements of EN 13706/E23. Profiles with an isopolyester resin mix are typically used. Vinyl ester resin profiles are also available if higher chemical resistance is required.

Request for a quote

Germany

Verified by Europages

The handrail of your GRP stairway won’t ever feel really cold to the touch, even in winter, thanks to the low thermal conductivity of the pultruded GRP profiles. Generally speaking, all TC structures are developed in accordance with DIN EN ISO 14122. Certification according to DIN EN ISO 90012015 confirms that our quality management is sound. Pultruded GRP construction profiles produced by Exel Composites meet the requirements of EN 13706/E23

Request for a quote

Germany

Verified by Europages

Do you need safe and corrosionresistant access systems for your operations? And do these stairs also need to be movable? Then get in touch. We can design and manufacture special solutions as oneoff commissions or small batches, or a standard solution in larger quantities. Made of glass fibrereinforced plastic profiles, our mobile stairs are suitable for using in corrosive environments or for sites where a stairway needs to have an electrically insulating effect.

Request for a quote

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

PASCHAL Dam bracket is used wherever single-sided climbing is required, for example for reservoir dams, port and harbour constructions, lock-up constructions in inner city projects and refurbishment measures. The formwork panels can be tilted in fully variable positions on the dam brackets in both directions, allowing for ideal adjustment to the full range of wall slopes and wall abutments. All working platforms remain horizontal while the formwork is tilted.

Request for a quote