Results for
Germany
Kronseder KFT fresh exhaust air dryer in the form of an assembly set or in a sea container 15 m³ - 30 m³ The containers are built to standard dimensions. Length 6 m or 12 m. Hot water or electricity is offered as heating medium. The ventilation and heating system is installed in a tower construction. Appropriate inlet and outlet air flaps are provided for demoisturizing. The dryer can be used to dry simple types of wood, such as spruce and Douglas fir, and for heat treatment in compliance with IPPC.
Request for a quoteGermany
Adapter RSAM80 & RSAMG80 Bridge construction and bridge monitoring Tunnel construction Earth and rock monitoring – e.g. steeply upwards or along the slope Enables measurements and monitoring from virtually any angle, where space is tight and on hard-to-reach areas The clip system allows the original measurement point to be restored both quickly and cheaply in the event of damage. Many measurements can be carried out within a short time when used with up-to-date total stations. Drilling is no longer required as pre-installed anchor sleeves for Dw15 threads can be used for mounting Anchor sleeves can be installed during the construction phase for survey points, e.g. above and below the bridge support, in the case of retaining structures and in many more applications. Material: Stainless steel V4A Temperature and UV-resistant Crosshairs are imprinted on the backing plate under the exact centre of the reflective target to ensure the survey point is durably marked. If the reflective t
Request for a quoteDo you sell or make similar products?
Sign up to europages and have your products listed
Results for
Installation construction - Import exportNumber of results
2 ProductsCountries
Company type
Category