• europages
  • >
  • COMPANIES - SUPPLIERS - SERVICE PROVIDERS
  • >
  • winding assembly

Results for

Winding assembly - Import export

GermanyManufacturer/producer

Germany

In this case, the innovation lies in that the concrete towers are built from the inside. in the traditional assembly the concrete tower is scaffolded from outside and then refi tted part by part. Not only is this extremely timeconsuming during the assembly, but also the setup of these scaffolds binds precious time resources and tower crane capacities. During the assembly of concrete segments with the Gplatform , the platform is connected inside the fi rst concrete ring by a mobile crane, in compliance with the requirements for passenger transport. If the following concrete tower segment is attached, the crane has already been positioned properly in order to elevate the Gplatform to the next level. After lowering the crane gear, the Gplatform is inserted and pulled to the next tower section. During the upward movement, the assembly operators must not leave the Gplatfom.

Request for a quote

Germany

The custom-tailored capacitors of our E70 series are mainly applied for power factor correction or as resonance capacitors in induction furnaces that are operated at mains frequency (50/60Hz). The E70 are made alternatively in two designs: Inside the steel case, there is a large number of individual self-healing capacitors, each one of them protected by its own break-action mechanism. In the event of a failure, the affected element is disconnected separately while the capacitor as a whole continues to function with slightly decreased total capacitance. Windings assembled inside a hermetically sealed metal case, filled with solid resin, and protected by a pressure sensor similar to the capacitors of our ranges E56/E59.

Request for a quote

Do you sell or make similar products?

Sign up to europages and have your products listed

Add my business