• europages
  • >
  • COMPANIES - SUPPLIERS - SERVICE PROVIDERS
  • >
  • well construction

Results for

Well construction - Import export

Distributor

France

Verified by Europages

These precise slideways are used in e.g. machine, fixture and metrology equipment construction as well as in the optical and precision engineering industries. The central set screw M1 can be replaced by a clamping lever 06460. The stated permissible load values (F) are designed for dynamic loads with a service life of 1 million travel cycles. For static loads, 10 times the table value F is permitted. The torque values apply only to centred slides. An additional centring hole is located at holes D2 and D3 on the top of the slide. Other connecting elements can be precisely mounted on the slide in combination with our centring rings 20240. TI E = number of fastening holes E/M inside. TA E = number of fastening holes E/M outside. TI E1 = number of fastening holes E1/D1 inside. TA E1 = number of fastening holes E1/D1 outside.

Request for a quote

Portugal

Verified by Europages

The owner thoroughly discussed all the technical details with the designers and builders of the constructions as well as with the designers and manufacturers of roof structures.

Request for a quote

Spain

Verified by Europages

Processes: MIG/MAG Materials: Carbon steel – Stainless – Aluminum Applications: Metal carpentry and boilermaking – Shipyards – Construction of equipment and machinery – Nuclear Petrochemistry – Automobile and Railway Industry – Maintenance – Mechanical workshops – Repairs

Request for a quote

Do you sell or make similar products?

Sign up to europages and have your products listed

Add my business