Italy, Goito
... and removing the mixing water before hardening. Wet a few hours before injecting the grout, avoiding water pockets and any excess water on the surface. Clogging and consolidating fillings can be carried out both by gravity and by manual / automatic pumps, depending on the type of application. • Keep the external and exposed surfaces of the grout moistened for at least 24 hours Approximately 1700 kg of Grout Cable for each cubic metre of volume to be filled.

The europages app is here!

Use our improved supplier search or create inquiries on the go with the new europages app.

Download in the App Store

App StoreGoogle Play