... strength of the existing ground and eliminate any internal stresses to prevent issues such as collapse or pitting. To achieve this, only mechanical material can be laid on the existing floor before asphalt application. This base layer, which will be laid before asphalt, must be suitable for compacting. Considering the 15-day sieve analysis results, the mixing ratios are determined according to the previous percentage rates. Foreign materials such as clay and silt should not be present in the mechanical material layer. Robust, clean aggregate should be used.