No results in the radius of 50km found.
Results in the radius of 250km are shown.
... natural gas transportation network. The Terminal consists of a docking station for ships with a capacity of 40,000 to 216,000 m3 of LNG, with an unloading time of approximately 20 hours, three storage tanks with a commercial capacity of 390,000 m3 of LNG, and seven vaporizers intended for the regasification of LNG. The LNG Terminal has a nominal emission capacity of 900,000 m3(n)/hour, a maximum of 1,350,000 m3(n)/hour, and can load up to 4,500 tanker trucks per year.

The europages app is here!

Use our improved supplier search or create inquiries on the go with the new europages app.

Download in the App Store

App StoreGoogle Play