For over a decade, we have been delivering prefabricated wooden structures using the MiTek® system.
In our production facility located in Kłecko near Gniezno, we use only the best materials: dried timber of strength class C24 and steel connector plates. Our modern production line, combined with a highly qualified engineering team, ensures that the roof trusses, frame halls, and Posi Joist floor...