Belgium, Diksmuide
12km
...Amery bvba is your partner for carrying out horizontal drilling. Through horizontal drilling, you can install pipes without having to break open obstacles (terrace, driveway, road, highway, river, etc.). This is done using the so-called "no-dig" principle, meaning that there is little to no excavation involved. Only at the starting point and the endpoint is excavation necessary.

The europages app is here!

Use our improved supplier search or create inquiries on the go with the new europages app.

Download in the App Store

App StoreGoogle Play