Pressure of the nitrogen surface 50-200 bar - pressure output 200 bar - Hydraulic connection to our UNI Future 2050 pressure at 850 bar infinitely adjustable The charging time of a 18 liter pressure reservoir with 200 bar operation pressure is about 1,5 minutes if the pressure loss in the storage is 20 bar (180 bar) and output pressure of the nitrogen bottle is up to 200 bar. At a output pressure of 50 bar the charging time is about 4,5 minutes. !!!TARGET PRICE!!!
Germany
Poppe + Potthoff Maschinenbau GmbH supplies compressor units and pressure control systems of up to 400 bar for various gases. We offer ready-to-connect units to increase the existing pressure for pneumatic and hydraulic applications. In this way, the performance of existing systems can be increased flexibly and efficiently. Our compressor units are used wherever the existing system pressure is insufficient to implement specific applications. Of course, our systems are UL or CE compliant as required. In addition, we offer you service and support directly on-site.
Request for a quoteCreate one request and get multiple quotes form verified suppliers.