The single mast transport platform GEDA 1200 Z/ZP represents an alternative to the well-known GEDA uni-mast system platforms. Its maximum load bearing capacity of 1500 kg or up to 7 people makes this single mast platform the ideal hoist for transporting people and materials. he load bearing capacity depends on the platform variant that is used. You can choose between 3 different platforms variants: — platform “A“ 1.4 x 2,0 x 1.1/1.8 m, load bearing capacity 1500 kg — platform “B“ 1.4 x 2,6 x 1.1/1.8 m, load bearing capacity 1200 kg — platform “C“ 1.4 x 3,2 x 1.1/1.8 m, load bearing capacity 1000 kg — platform “C 1500 kg“ 1.4 x 3,2 x 1.1/1.8 m, load bearing capacity 1500 kg You can also have equipped your transport platform with a roof.
Germany
The transport platform GEDA 1500 Z/ZP unites two different machines in one: a hoist for materials with a load bearing capacity of 2000 kg and a transport platform for material and persons. In contrast to ordinary material hoists, for which the transport of people is strictly prohibited, the GEDA 1500 Z/ZP may transport 7 people in addition to goods as soon as it has been switched to the operating mode “transport platform“. Just as for all other GEDA twin mast transport platforms, you can choose between a lot of different transport platforms and as many different types of roofs. The load platforms provide enough space for bulky and heavy building materials. This can help to improve logistics on site. In order to prevent people from falling down, hot-dip galvanized landing level safety gates with mechanically locked sliding doors are installed to all loading and unloading points.
Request for a quoteGermany
Two in one: construction hoist with 500 kg loading capacity and transport platform for 3 persons max. Very innovative is the new foldable platform and a fork take-up point is included as standard. The GEDA 300 Z/ZP lift is perfect for operation in narrow driveways and backyards as the flat cable bin is saving even more space. There are different reasons to decide in favour of the GEDA 300 Z/ZP: The usage as construction hoist or transport platform (possible by using two separate controls), safety devices (limit switches, speed dependent safety brake, overload switch-off) and the using of the GEDA UNI-MAST are only a few convincing arguments for the GEDA 300 Z/ZP.
Request for a quoteGermany
The GEDA 2500 Z/ZP transport platform is the new powerhouse from GEDA. Thanks to the innovative GEDA SVARIO-MAST system, the transport platform is guided on only one mast and has a load capacity of 2500 kg. This makes it easy to transport heavy construction materials to their place of use up to a height of 200 m. The comfortable and large platform with dimensions of 1.45 m x 3.55 m can transport construction materials and up to 7 passengers quickly and safely. The extremely high platform (2.60 m) makes transporting bulky goods easy. For loading the platform on a lorry, the roof can simply be lowered to 2.10 m. With two separate controls, the GEDA 2500 Z/ZP can be used simply as a material hoist with a lifting speed of 40 m/min or as a transport platform for passengers and materials with a lifting speed of 12 m/min. The GEDA 2500 Z/ZP expands the versatile transport platform range and offers another solution for the individual conditions at your construction site.
Request for a quoteGermany
The optimal helper when anchoring is not possible - the GEDA 1500 Z/ZP F! As a free-standing transport platform, it can become essential on a wide variety of construction sites. Whether architectural conditions, glass facades or simply current construction site conditions, the GEDA 1500 Z/ZP F is perfect as a free-standing construction hoist. Maximum flexibility and quick readiness for use are the special features of this hoist. Thanks to the GEDA UNI-X-MAST system, it can be operated free-standing up to a lifting height of 12 m and therefore without time-consuming anchorings. With a load capacity of 1300 kg, persons and material can be safely transported up and down. With two lifting speeds of 24 m/min in material mode and 12 m/min in personnel mode, rapid construction progress is guaranteed.
Request for a quote